8.02.2007

Whoa!!!

    

Wow! From out of nowhere the major plumbing is done. A friend recommended his long time plumber Alex Lopez, and though he 's rarely in downtown Los Angeles, he happened to be in the area yesterday and offered to come have a look. He was extremely gracious and offered to move another obligation and come back downtown today and now, voila!, it's done. We core drilled three holes in the 9-1/2" concrete slab floor and installed plumbing for the toilet, shower drain and kitchen sink - which doubles as a bona-fide vent for all three fixtures. Smooth sailing for all that waste...what joy! Needles to say, my freshly minted floors took a beating, but that's only because I'm a knucklhead and decided to make ev'rything look purty before the rough work was done. A few touch-ups and we'll be back to exalting in no time. I've yet to place a large materials order, and now with this rough plumbing done, which has been the most ambigous cornerstone in this project, there is nothing holding me back from fervently moving forward.

No comments: